PPAP / Quality Package
A structured approval documentation package for first production parts — covering dimensional reports, process documentation and material evidence required before series production begins.
When a standard dimensional report and material certificate are not enough — for example when your quality system or customer requires formal first article approval — we compile a complete PPAP-style quality package alongside production.
- Balloned drawing with all measured dimensions referenced
- Dimensional measurement report — CMM or manual
- Material certificate with heat / lot traceability
- Process flow chart from raw material to shipment
- Packaging and labelling specification validation
Documents in the Package
- Balloned drawing (all dimensions referenced)
- Dimensional measurement report
- Material test certificate (MTC)
- Chemical composition analysis
- Process flow chart
- Packaging and labelling check sheet
Optional Additions
- Surface roughness (Ra) measurement
- Hardness testing report
- EN 10204 3.1 Material Certification
- Control plan summary (VDA 6.3 aligned)
- First article inspection report (FAIR)
- Supplier ISO 9001 certificate copy
What to expect
A PPAP package adds lead time — typically one to two weeks beyond standard production. We align on the exact document list before production starts so there are no surprises at approval stage. If your quality system uses a specific template or form, send it to us and we will use it.
Start a conversation
Tell us about your project — what you need, in what quantity, and when. We take it from there and get back to you within 48 hours.
PPAP / Quality Package
A structured approval documentation package for first production parts — covering dimensional reports, process documentation and material evidence required before series production begins.
When a standard dimensional report and material certificate are not enough — for example when your quality system or customer requires formal first article approval — we compile a complete PPAP-style quality package alongside production.
- Balloned drawing with all measured dimensions referenced
- Dimensional measurement report — CMM or manual
- Material certificate with heat / lot traceability
- Process flow chart from raw material to shipment
- Packaging and labelling specification validation
Documents in the Package
- Balloned drawing (all dimensions referenced)
- Dimensional measurement report
- Material test certificate (MTC)
- Chemical composition analysis
- Process flow chart
- Packaging and labelling check sheet
Optional Additions
- Surface roughness (Ra) measurement
- Hardness testing report
- EN 10204 3.1 Material Certification
- Control plan summary (VDA 6.3 aligned)
- First article inspection report (FAIR)
- Supplier ISO 9001 certificate copy
What to expect
A PPAP package adds lead time — typically one to two weeks beyond standard production. We align on the exact document list before production starts so there are no surprises at approval stage. If your quality system uses a specific template or form, send it to us and we will use it.
Start a conversation
Tell us about your project — what you need, in what quantity, and when. We take it from there and get back to you within 48 hours.